Back to Snagging Report

    Full Snagging Inspection Scope

    A systematic room-by-room and area-by-area review of workmanship, finishes, installed elements and apparent function.

    How the scope applies

    The snagging inspection scope is adapted to the individual property. The inspection covers the applicable items listed below where they form part of the property and are present, visible, reasonably and safely accessible, and practicable to inspect using the agreed inspection methods.

    Not every item listed below will apply to every property. The applicable scope depends on the property’s type, configuration, features and installed systems.

    How we inspect

    We work area by area and room by room, checking finished work, visible installations and normal operation. Identified snags are located and documented with photographs and corrective information.

    The inspection, in detail

    Walls, Ceilings & Finishes

    • Paint finish and coverage; plaster and render finish; uneven or poorly finished surfaces.
    • Visible surface defects, cracks, dents, chips, damage, staining and discolouration.
    • Unfinished areas, poorly finished junctions and edges, and defects around fittings, sockets and openings.

    Floors, Tiles & Skirting

    • Damaged, cracked or chipped tiles; uneven or visibly defective finishes; damaged flooring.
    • Grout condition and consistency, missing or defective grout, and hollow-sounding or poorly bonded tiles identified during inspection.
    • Transitions between floor finishes, skirting boards, visible gaps, alignment and finishing at edges and junctions.

    Doors & Frames

    • Doors and frames: opening, closing, alignment and visible damage.
    • Handles, hardware, locks, latches and door stops; sliding or folding mechanisms.
    • Gaps and finishing around frames.

    Windows, Glazing & Shutters

    • Windows and frames: opening, closing, alignment and operation.
    • Glazing, visible scratches, chips and damage; handles, locks, seals, sealant and finishing around frames.
    • Shutters / persianas and electric shutter operation.

    Kitchen

    • Cabinets and doors, drawer operation, alignment, adjustment, handles and fittings.
    • Worktops, joints, edges, visible damage, splashbacks, tiling, silicone and sealant.
    • Sink and tap installation, visible plumbing connections and drainage; electrical outlets and visible fittings.
    • Extractor installation and operation.

    Bathrooms & Wet Areas

    • Sanitaryware, toilets, basins, taps, showers, screens and baths; mirrors and installed accessories.
    • Tiles, grout, silicone, sealant, visible fittings, and finishing around penetrations and junctions.
    • Visible plumbing connections, hot and cold water, drainage, shower floor falls and drainage behaviour.
    • Visible leakage and moisture indicators.

    Electrical

    • Visible sockets and switches: alignment, installation, damaged or loose fittings.
    • Basic checks of accessible socket outlets with an appropriate tester; installed lighting points and fittings.
    • Distribution board, visible installation defects and relevant controls.

    Plumbing & Water

    • Taps, hot and cold water, water flow, visible connections and leakage indicators.
    • Toilets and flushing, sinks, basins, showers and drainage.
    • Simultaneous water-flow observation and installed hot-water equipment.

    Air Conditioning, Heating & Ventilation

    • Indoor units and accessible outdoor equipment: visible installation and finishing.
    • Controls, normal operation, apparent heating or cooling response, airflow and unusual noise or vibration.
    • Visible condensate or leakage concerns, pipework and wall penetrations; ventilation and extract systems.

    Fixtures, Fittings & Joinery

    • Built-in wardrobes, cabinet doors and drawers, shelving, handles and hardware.
    • Alignment, opening and closing, visible damage, incomplete installation and finishing around fitted items.

    Terraces, Balconies & Private Exterior Areas

    • Tiles and surface finishes, cracking, damage, grout and joints.
    • Surface falls, drainage, ponding, thresholds and wall-to-floor junctions.
    • Railings and balustrades, visible sealant, doors and openings, exterior finishes and visible water-ingress or waterproofing risk indicators.

    Exterior Finishes

    • For exterior elements forming part of the property: render and paint finish, visible cracks, damage and unfinished surfaces.
    • Sealant and junctions, doors and gates, visible external fittings.
    • Terraces and paved areas, drainage and visible defects in completed exterior works.

    Functional Checks

    • Doors, windows, shutters / persianas, gates, cabinets, drawers, locks and handles.
    • Taps, sanitary fixtures, toilets and drainage.
    • Accessible electrical outlets, lighting and controls, air conditioning and ventilation.

    Inspection Evidence / Every Snag Documented

    • The exact location and clear description of each identified issue.
    • Photographic evidence and recommended corrective action.
    • Supporting observations relevant to the finding.

    Your Snagging Report

    A structured photographic defect report that clearly communicates identified defects and incomplete items to the developer, builder or contractor.

    • Identified defects and incomplete items
    • Location and photographic evidence
    • Practical corrective information

    Know what needs fixing before you accept the property.

    Back to Snagging Report